West Courtyard Renovation

The West Courtyard renovation has been in planning for a number of years. The current plan involves moving the Toastie Bar to the other side of the room and creating a seating area in the outside area behind the current location of the Toastie Bar (see Courtyard Panorama).

The new Toastie Bar will be made larger and more open: with a £7000 manually-operated coffee machine installed to serve drinks during the day, with scope for a greater variety of snacks and drinks too. The new Toastie Bar will also be used more to serve drinks during events.

The courtyard itself will become more of a café space, but some of the current facilities (pool table, table football and vending machines) will remain.

 

There are currently three proposed designs for the renovation:

 

West Courtyard Proposed Layout 1                                                                    Panorama

 

West Courtyard Proposed Layout 2                                                                     Panorama

 

West Courtyard Proposed Layout 3                                                                      Panorama

You can find further Floor Plan Drawings for each of the 3 Proposals here.

 

We would really appreciate it if you could fill out the feedback form (link below) so that the development can go ahead in a way that pleases the greatest number of the JCR possible. The time allocated for the renovation is currently from the beginning of September to the end of October.

West Courtyard Proposal Feedback Form for Castle Students